All projects

18 Conduit Street, London

The brief

Our works at 18 Conduit Street included a strip out of the existing fixtures and fittings in order to refurbish the building from the ground to fifth floors.

Project details
Client

Hanover Cube

Location

London

Programme

42 Weeks

Value

£2M

18 Conduit Street, London
Project team

Gary Pearce

Doug Howorth

John Scott

Kevin Culverhouse

Kate Pink

Commercial Offices

Attractive and functional spaces featuring bespoke joinery.

The extensive works on this project included the strip out of existing fixtures and fittings from the Ground to Fifth floor office spaces.  This included, new M&E services, fire alarm, floor coverings, walls, ceilings WC’s shower room and kitchen areas, new decorations, a full lift refurbishment along with new lighting and decorations throughout. 

We installed new lighting and AC systems, a full height internal communal steel staircase and completed external repairs and decorations to the front and rear elevations.  We installed, new windows and doors and undertook modifications to the existing external fire escape staircase.  Installation of a new second to fifth floor structurally sound steel rear lightwell infill was also completed along with new main roof structures and dormers.

On the roof we created a new flat roof area with a timber decked terrace and lighting and replaced pitched and flat roof coverings throughout.